MPI Discovery completed installation London Array


London Array_Last Nacelle 003

14/12/2012

MPI Discovery has safely completed the installation of turbines on London Array.

MPI Discovery has safely completed the installation of 101 of the 175 turbines with all 175 being installed in 2012, MPI has played a major part in what has to be an offshore wind farm installation record.

Images show the last nacelle and the last blade being lifted into place on 13 December 2012.

Read the article in the London Array newsletter of December 2012: http://www.londonarray.com/2012/12/13/final-turbine-installed-at-london-array/

ewea renewable-uk bsc nwea vwea

© Copyright. MPI Offshore B.V. All Rights Reserved.