Vessel Tracking
Monopile Upending Frame (MUF)
Tuesday 11 August 2009
The Monopile Upending Frame (MUF) was designed and supplied by IHC Gusto BV to MPI’s specification to facilitate the handling of large offshore piles.

The Monopile Upending Frame (MUF) was designed and supplied by IHC Gusto BV to MPI’s specification to facilitate the handling of large offshore piles from the horizontal transportation position to vertical without the need for a large capacity crane.
The pile is inserted into the MUF (using strand jacks or trailers) to a position where the centre of gravity is just beyond the hinge point and is gripped by hydraulic cylinders.
The pile is then rotated in the upending frame under its own weight controlled by winches. Once vertical the pile can be lowered to the sea bed by jacking down the installation vessel (if possible) or releasing the grips.
General Information
Total Length: 13,250 mm
Maximum Width (Upend Frame): 9,060 mm
Maximum Width (Base Frame): 13,200 mm
Pile Diameter: 4,000 – 6,000 mm
Maximum Pile Length: 61.2 m
Maximum Pile Weight: 600 Tonnes
Environmental
Maximum Operational wind Speed: 20 m/s
Maximum Operational Current (water depth 15m): 2 m/s
Maximum Operational Current (water depth 15 – 35m): 1 m/s
Maximum Vessel Heel: +/- 0.3 Deg
Maximum Vessel Trim: +/- 0.3 Deg
LATEST NEWS
MPI Celebrates Launching MPI Adventure Monday 6 September 2010
On 27 August 2010, MPI Offshore proudly held the launching ceremony of “MPI Adventure”, the first of two state-of-the art wind turbine installation vessels, currently under construction at the Cosco Nantong Shipyard in China.
READ MORE100 Turbines in less than 100 days Thursday 26 August 2010
More than a month ahead of schedule, Vestas completes the installation of the 100th turbine at the Thanet Offshore Wind Farm.
READ MOREMPI Workboats to exercise option for further workboat Wednesday 4 August 2010
MPI Workboats are happy to announce that it has exercised an option for the construction of a further state of the art, purpose built wind farm support aluminium catamaran for delivery in June 2011.
READ MOREPROJECTS
Thanet Offshore Wind Farm
Wednesday 5 August 2009
During December '08 MPI Offshore finalized a third Party charter to take Resolution to assist with the construction of the foundations for the Thanet Offshore Wind Farm, now owned by Vattenfall the Swedish/German Utility.
READ MORE