MPI Discovery and MPI Adventure
Monday 8 June 2009
Following the success of MPI Resolution, MPI Offshore have invested in two new builds, MPI Adventure and MPI Discovery.

Delivery of these two vessels was in the spring of 2011 and autumn 2011 resp. (available in Europe). Both vessels have enhanced systems which will maintain MPI Offshore as the preferred ‘Installation Solution.’
Download MPI Adventure Brochure
Download MPI Discovery Brochure
MPI Resolution was the first purpose-built vessel for installing offshore wind turbine components and foundations. MPI Resolution has proved that the Transport Installation Vessel (TIV) concept is the choice of the industry.

MPI Adventure and MPI Discovery are the second and third purpose-built vessels for MPI Offshore.
Their enhanced design features have been sourced and integrated from designing and operating MPI Resolution.
These new built vessels will transport, lift and install more wind turbines and their foundations than any other solution. This is achieved by improved deck space, lifting capacity, jacking speed, increased power and improved enviromental operability .
This has been achieved without losing the original concept, of the unique combination of tested technologies, pioneered by MPI Resolution and MPI Offshore.

LATEST NEWS
24-04-2013 - MPI Resolution awarded GeoSea Charter Party Wednesday 24 April 2013
MPI Offshore is pleased to announce the award of a charter party in respect of MPI Resolution by GeoSea N.V., subsidiary of the Belgian based DEME Group.
READ MORE22-04-2013 Day One of the E.ON Journey Monday 22 April 2013
In June 2011, E.ON and MPI entered into a long-term partnership for a six-year charter of MPI Discovery. Nearly two years later, 28 March 2013 marked the first day of the charter period.
READ MORE11-03-2013 - MPI Adventure awarded Trianel Wind Farm Borkum Charter Party Monday 11 March 2013
MPI Offshore is pleased to announce the award of a charter party in respect of MPI Adventure by Trianel Windkraftwerk Borkum GmbH & Co. KG for the installation of wind turbine generators on the Trianel Borkum Offshore Wind Farm situated off the Northern Coast of Germany.
READ MOREPROJECTS
05-08-2009 - Thanet Offshore Wind Farm
Wednesday 5 August 2009
During December 2008 MPI Offshore finalized a Third Party charter to take MPI Resolution to assist with the construction of the foundations for the Thanet Offshore Wind Farm, now owned by Vattenfall, the Swedish/German Utility.
READ MORE