Pile Guidance Tool (PGT)

Tuesday 11 August 2009

The Pile Guidance Tool (PGT) was designed and supplied by IHC Gusto BV to MPI’s specification to facilitate the guidance and adjustment of large offshore piles during driving.


 

The Pile Guidance Tool (PGT) was designed and supplied by IHC Gusto BV to MPI’s specification to facilitate the guidance and adjustment of large offshore piles during driving.

Download Brochure

The monopile is either lifted into position on the seabed using a crane or MPI’s Monopile Upending Frame (MUF), the PGT is then activated to grip the pile before the crane is released.

The PGT can then be used to align the pile vertically and guide it during the early stages of driving.

General Information

Total Length: 9,100 – 14,700 mm
Width: 6,900 – 16,700 mm
Height: 4,300 mm
Pile Diameter: 4,000 – 6,000 mm
Maximum Guide Load: 50 Tonnes (in horizontal plane)
Maximum Vertical Load: 10 Tonnes
In/Out Adjustment Range: +/- 1,250 mm
Side/Side Adjustment Range: +/- 1,000 mm

Environmental

Maximum Operational wind Speed: 20 m/s
Maximum Operational Current (water depth 15m): 2 m/s
Maximum Operational Current (water depth 15 – 35m): 1 m/s
Maximum Vessel Heel: +/- 0.3 Deg
Maximum Vessel Trim: +/- 0.3 Deg

Go back

Renewable UK 2010 - Glasgow, November 2nd-4th 2010

LATEST NEWS

MPI Celebrates Launching MPI Adventure Monday 6 September 2010

On 27 August 2010, MPI Offshore proudly held the launching ceremony of “MPI Adventure”, the first of two state-of-the art wind turbine installation vessels, currently under construction at the Cosco Nantong Shipyard in China.

READ MORE

100 Turbines in less than 100 days Thursday 26 August 2010

More than a month ahead of schedule, Vestas completes the installation of the 100th turbine at the Thanet Offshore Wind Farm.

READ MORE

MPI Workboats to exercise option for further workboat Wednesday 4 August 2010

MPI Workboats are happy to announce that it has exercised an option for the construction of a further state of the art, purpose built wind farm support aluminium catamaran for delivery in June 2011.

READ MORE

PROJECTS

Thanet Offshore Wind Farm

Thanet Offshore Wind Farm
Wednesday 5 August 2009

During December '08 MPI Offshore finalized a third Party charter to take Resolution to assist with the construction of the foundations for the Thanet Offshore Wind Farm, now owned by Vattenfall the Swedish/German Utility.