The Pile Guidance Tool (PGT) was designed and supplied by IHC Gusto BV to MPI’s specification to facilitate the guidance and adjustment of large offshore piles during driving.


 

The Pile Guidance Tool (PGT) was designed and supplied by IHC Gusto BV to MPI’s specification to facilitate the guidance and adjustment of large offshore piles during driving.

Download Brochure

The monopile is either lifted into position on the seabed using a crane or MPI’s Monopile Upending Frame (MUF), the PGT is then activated to grip the pile before the crane is released.

The PGT can then be used to align the pile vertically and guide it during the early stages of driving.

General Information

Total Length: 9,100 – 14,700 mm
Width: 6,900 – 16,700 mm
Height: 4,300 mm
Pile Diameter: 4,000 – 6,000 mm
Maximum Guide Load: 50 Tonnes (in horizontal plane)
Maximum Vertical Load: 10 Tonnes
In/Out Adjustment Range: +/- 1,250 mm
Side/Side Adjustment Range: +/- 1,000 mm

Environmental

Maximum Operational wind Speed: 20 m/s
Maximum Operational Current (water depth 15m): 2 m/s
Maximum Operational Current (water depth 15 – 35m): 1 m/s
Maximum Vessel Heel: +/- 0.3 Deg
Maximum Vessel Trim: +/- 0.3 Deg

Go back

All Energy 2012 - Aberdeen, May 23rd-24th 2012

LATEST NEWS

MPI Offshore Scoop Industry Award Thursday 16 February 2012

MPI Offshore have been announced as the inaugural winner of the Offshore Renewables award at the recent Annual Offshore Support Journal awards held in London.

READ MORE

MPI Offshore Takes Delivery of MPI Discovery Friday 4 November 2011

MPI Offshore Limited (MPI) is pleased to announce the delivery, in Qidong, People’s Republic of China, of the MPI Discovery, the second of two state-of-the art wind turbine installation vessels to be built at the Cosco Qidong Shipyard. The vessel left the Shipyard today, 28 October 2011.

READ MORE

E.ON Secures State-Of-The-Art Offshore Vessel from MPI Wednesday 29 June 2011

E.ON Climate & Renewables and MPI-Vroon have today signed a 6 year charter for the MPI Discovery, a specialist vessel used in the construction of offshore wind farms.

READ MORE

PROJECTS

Thanet Offshore Wind Farm

Thanet Offshore Wind Farm
Wednesday 5 August 2009

During December '08 MPI Offshore finalized a third Party charter to take Resolution to assist with the construction of the foundations for the Thanet Offshore Wind Farm, now owned by Vattenfall the Swedish/German Utility.

READ MORE