A unique and purpose built vehicle to lay and bury interconnection array cables as part of MPI Offshore’s single source solution for off-shore wind turbine installation.

MPI Remotely Operated Vehicle


The Remotely Operated Vehicle LBT1 (ROV) is a powerful, rough terrain tracklayer capable of operating in up to 50 metres of water. It can be launched from the Resolution, lay and bury the cables simultaneously with other construction operations.

Download Brochure

The ROV can carry up to 1,000 metres (3,330 feet) of 110/120 mm diameter cable on a subsea reel that is hydraulically driven, enabling it to payout and pick up while on the sea bed. This eliminates the need for cable catenary control from the installation vessel during lay and burial operations.

Its combination of chain cutter and jetting tool either work together or separately, depending on the conditions, to lay and bury cable at one pass, with a typical speed of 200m/hr (650ft/hr) even on firm seabeds. Despite weighing almost 60 tonnes (132,000 lbs) when fully-laden with cable, its wide tracks also support and propel it on the weakest soils.

The ROV is purpose built for short inter turbine cable runs. It can reverse within a few metres of the start j-tube to commence the cable burial. At the second end, the cable is laid off appropriate to the j-tube design.

The ROV can be operated from vessels other than the Resolution and is available for hire as a stand-alone vehicle. It provides, in particular, the optimum solution for the rapid laying of short lengths of cable in applications involving tight turns that a plough could not achieve.

MPI Remotely Operated Vehicle in the water


General Information

Maximum Operating Depth: 50m
Vehicle Length (less jet tool): 7.5m
Vehicle Maximum Length (3.0m jet tool fitted): 11.5m
Vehicle Width: 7.5m
Vehicle Height (to docking point): 7.75m
Weight in Air (without reel fitted): 35Te
Weight in Air (with reel & 20Te cable): 60Te
Track Type: Plastic track plates on a single steel chain
Ground Pressure: 25-30kPa
Speed Range (no burial): 0-2,000m/hr
Speed Range (trenching): 50-1,000m/hr

Vehicle Power
900kW Total - 1 x 300kW-4 pole underwater electro-hydraulic unit - 2 x 300kW-4 pole underwater direct electric drive water pumps
Tractive Effort: 20Te under good seabed conditions
Structure: Monocoque chassis constructed from high strength steel
Electronics Pod: One atmosphere steel pressure vessel 50.0m depth

Jet Tool Burial Specification

Configuration: Twin-legged device straddling the cable
Power: 2 x 300kW, 3.3kV, 60Hz. Submersible water-filled motors
Pumps: 2 x Pleuger KN357 pumps
Soil Strength (maximum): 100kPa shear strength
Trench Depth Options: 1.6m and 3.0m
Cable Path Width: 150mm
Cable Bend Radius: 1.6m during lay operations

Chain Cutter Specification

Configuration: Chain type mechanical cutter, mounted under the centre of the vehicle
Power: 150kW
Soil Strength: Up to 400kPa shear strength. Some higher strength soils are cuttable
Trench Depth: 1.6m
Cutting Picks: Rock picks, 25mm dia tungsten carbide point attack tools for hard, abrasive ground
Hydraulic Supply: From vehicle hydraulic system
Control Functions: Tool depth and cutter speed

Vehicle Cable Reel Specification

Structure: High strength steel
Core Diameter: ;3.2m
Width: 1.7m
Cable Capacity: 1,000m (@ cable dia 110mm to 120mm)
Weight: Empty – 4,000kg. Loaded – 25,000kg
Reel Drive: Hydraulic, from the vehicle hydraulic system

Surveillance Specification

Cameras: A total of 5 cameras, combining colour and mono output
Sonar: Kongsberg MS1000 front and rear mounted
Cable Tracking: Interface to TSS cable tracking equipment

GPS Position
CSI wireless DGPS Max;
Frequency – 1.575GHz;
Horizontal accuracy - < 1.2m

Go back

All Energy 2012 - Aberdeen, May 23rd-24th 2012

LATEST NEWS

MPI Offshore Scoop Industry Award Thursday 16 February 2012

MPI Offshore have been announced as the inaugural winner of the Offshore Renewables award at the recent Annual Offshore Support Journal awards held in London.

READ MORE

MPI Offshore Takes Delivery of MPI Discovery Friday 4 November 2011

MPI Offshore Limited (MPI) is pleased to announce the delivery, in Qidong, People’s Republic of China, of the MPI Discovery, the second of two state-of-the art wind turbine installation vessels to be built at the Cosco Qidong Shipyard. The vessel left the Shipyard today, 28 October 2011.

READ MORE

E.ON Secures State-Of-The-Art Offshore Vessel from MPI Wednesday 29 June 2011

E.ON Climate & Renewables and MPI-Vroon have today signed a 6 year charter for the MPI Discovery, a specialist vessel used in the construction of offshore wind farms.

READ MORE

PROJECTS

Thanet Offshore Wind Farm

Thanet Offshore Wind Farm
Wednesday 5 August 2009

During December '08 MPI Offshore finalized a third Party charter to take Resolution to assist with the construction of the foundations for the Thanet Offshore Wind Farm, now owned by Vattenfall the Swedish/German Utility.

READ MORE