Image Gallery

Please click on any of the galleries below for more images.

MPI Resolution (new colours)

MPI Resolution (new colours)

Completed a months dry docking in the Damen Shipyard in Rotterdam.
She returned to the Tees a couple of weeks ago to have sea fastenings installed for her next Project the 'Thanet' offshore wind farm for Vattenfall.

19 images

MPI Resolution (old colours)

MPI Resolution (old colours)

The world's first purpose-built vessel for installing offshore wind turbines, foundations and transition pieces.

The MPI Resolution is a unique combination of tested technologies applied in innovative ways to provide a single vessel installation solution for the offshore wind sector.

12 images

New Build Progress

New Build Progress

MPI Adventure at Cosco Nantong Shipyard on MPI new builds project.
Photographs of the first MPI Newbuild Vessel “Adventure”, taken in late January 2010, with the vessel construction 29% complete.

18 images

MPI Don Quixote

MPI Don Quixote

Built in 2009, our 20m Wind Farm Service Vessel is currently the largest vessel in the MPI Workboat fleet.

Designed for all kinds of construction and O&M requirementswhere sea conditions are at their harshest. The vessel combines the ability to transfer passengers in higher sea states with a high level of crew comfort.

10 images

MPI Rosinante

MPI Rosinante

Built in 2009, our 15m Wind Farm Service Vessel is the third addition to the MPI Workboat fleet.

By moving the superstructure aft, the forward deck area almost doubles in size, enabling the 2.8t crane to be moved forward.

9 images

MPI Rucio

MPI Rucio

Built in 2009, our 15m Wind Farm Vessel is the fourth addition to the MPI Workboat fleet.

The vessel benefits from a large, full height deck store which is incorporated into the superstructure. Access is provided from the main deck allowing for easy storage of equipment and spares.

4 images

MPI Sancho Panza

MPI Sancho Panza

Built in 2008, our 15m Wind Farm Service Vessel was the first addition to the MPI Workboat fleet.

The layout of the vessel gives a seperate crew saloon at deck level with galley area.

9 images


Go back

All Energy 2010 - Aberdeen, May 19th & 20th 2010

LATEST NEWS

MPI Secure London Array Charter for Adventure Wednesday 3 February 2010

The consortium developing the London Array, the world’s largest offshore wind farm, have today announced that a charter has been awarded to MPI Offshore Ltd to use Adventure for the installation of foundations and turbines for the first phase of what potentially will be the worlds first 1GW offshore wind farm

READ MORE

1st Feb 2010 - MPI Resolution Thanet Wind Farm – Foundation Operations Update Monday 1 February 2010

During November 09 MPI Resolution completed her foundation operations in the Thanet offshore wind farm after successfully installing 84 No Transition Pieces (TP’s) and J-tube assemblies.

READ MORE

Resolution Operations Monday 30 November 2009

Resolution has just completed the installation of 84 No Transition Pieces at the Thanet Offshore Windfarm. The vessel charterers at this point of the project elected to transfer Resolution to installation of the Wind Turbine Generators leaving 16 No Transitions still to install by an alternative installation vessel.

READ MORE

PROJECTS

Thanet Offshore Wind Farm

Thanet Offshore Wind Farm
Wednesday 5 August 2009

During December '08 MPI Offshore finalized a third Party charter to take Resolution to assist with the construction of the foundations for the Thanet Offshore Wind Farm, now owned by Vattenfall the Swedish/German Utility.

READ MORE