Amrumbank West – MPI Adventure


01/07/2015

January 2014 – September 2015

Between January 2014 and September 2015, MPI Adventure, MPI Discovery and MPI Enterprise have worked on the Amrumbank West Offshore Wind Farm.

80 Foundations and 80 Siemens 3.6MW Wind Turbine Generators have been installed. The vessels operated in water depths of approximately 25m. MPI Offshore’s constant involvement in engineering and installation works for the E.On spread of projects has provided the client flexibility on vessel availability and cost savings due to the innovative multi-functional sea fastenings and construction tools which have been used on E.On’s Karehamn, Humber Gateway and Amrumbank projects in previous years.

The Amrumbank West Offshore Wind Farm is situated approximately 35 km north of Helgoland and 37 km west of Amrum in the German Exclusive Economic Zone of the North Sea. When fully operational by late 2015, Amrumbank West will have an annual capacity of 288 megawatts, enough to power 300,00 households.

ewea renewable-uk bsc nwea vwea

© Copyright. MPI Offshore B.V. All Rights Reserved.