Blyth – MPI Adventure


01/07/2015

September 2012 – November 2012

Between September 2012 and November 2012, MPI Adventure was used for the transportation and installation of a met mast on the Blyth offshore wind farm.

 

ewea renewable-uk bsc nwea vwea

© Copyright. MPI Offshore B.V. All Rights Reserved.