Thanet Offshore Wind Farm


01/07/2015

April 2009 – February 2010

During December 2008 MPI Offshore finalized a third-party charter to take MPI Resolution to assist with the construction of the foundations for the Thanet Offshore Wind Farm,  owned by Vattenfall, the Swedish/German utility.

The vessel was chartered from April 2009 till February 2010. Just before this charter period she completed her first dry docking in Rotterdam, during which the vessel was fitted with full complement of legs fitted to cater for wind farms depths of up to 35 metres.

During the charter period MPI Resolution installed 84 TPs and 30 Vestas 3.0MW WTGs.