North Hoyle Wind Farm

Monday 10 August 2009

MPI Offshore personnel were involved in the first UK offshore windfarm project, North Hoyle situated of the North Coast of Wales.

The Resolution jack-up vessels owners, Mayflower Energy were awarded a contract with Vestas as a consortium to engineer, supply, install and commission the 30 sets of components and subsea cabling for the offshore components for the North Hoyle.

The Port of Mostyn was used as the onshore base for this project, and final assembly of components and loadout onto transportation vessels were carried out by the company's management, supervision and labour.

The companies scope comprised of the following main offshore components:-

  • 30 sets of transition pieces, weighing 75te
  • 30 sets of WTG components
  • Array cabling - 27 cables
  • Export Cabling - 2 cables 11 & 13km in length
  • Termination and testing of the offshore switchgear, array and export cabling
  • Commissioning of the windfarm distribution system from the onshore switchroom to the offshore field location


The company chartered various installation and transportation jack-up vessels, tugs and other support vessels from a number of marine companies. These vessels were used to install the components circa 6 miles offshore from the North Wales coast, starting in Summer 2003 Two number transition pieces were transported on each trip, using a self-propelled jack-up. For the WTG phase a towed jack-up was used to transport 2 number sets of WTG components, with the nacelles ready assembled into 'bunny ears' formations. The last 3 WTG sites were completed by the Resolution jack-up vessel in early 2004.

Go back

All Energy 2012 - Aberdeen, May 23rd-24th 2012

LATEST NEWS

MPI Offshore Scoop Industry Award Thursday 16 February 2012

MPI Offshore have been announced as the inaugural winner of the Offshore Renewables award at the recent Annual Offshore Support Journal awards held in London.

READ MORE

MPI Offshore Takes Delivery of MPI Discovery Friday 4 November 2011

MPI Offshore Limited (MPI) is pleased to announce the delivery, in Qidong, People’s Republic of China, of the MPI Discovery, the second of two state-of-the art wind turbine installation vessels to be built at the Cosco Qidong Shipyard. The vessel left the Shipyard today, 28 October 2011.

READ MORE

E.ON Secures State-Of-The-Art Offshore Vessel from MPI Wednesday 29 June 2011

E.ON Climate & Renewables and MPI-Vroon have today signed a 6 year charter for the MPI Discovery, a specialist vessel used in the construction of offshore wind farms.

READ MORE

PROJECTS

Thanet Offshore Wind Farm

Thanet Offshore Wind Farm
Wednesday 5 August 2009

During December '08 MPI Offshore finalized a third Party charter to take Resolution to assist with the construction of the foundations for the Thanet Offshore Wind Farm, now owned by Vattenfall the Swedish/German Utility.

READ MORE